Files in this item

FilesDescriptionFormat

application/pdf

application/pdfFHWA-ICT-21-018.pdf (522kB)
(no description provided)PDF

Description

Title:Illinois’ Experience Using Quality Control for Performance and Pay for Performance to Determine Pay for Hot-mix Asphalt
Author(s):Al-Qadi, Imad L.; Rivera-Perez, José J.; García Mainieri, Javier J.; Sayeh, Watheq
Subject(s):Quality Control
Percent within Limits
Quality Assurance
Disincentive
Hot-mix Asphalt
QCP
PFP
Issue Date:2021-07
Publisher:Illinois Center for Transportation/Illinois Department of Transportation
Citation Info:Al-Qadi, Imad L., José J. Rivera-Perez, Javier J. García Mainieri, and Watheq Sayeh. 2021. Illinois’ Experience Using Quality Control for Performance and Pay for Performance to Determine Pay for Hot-mix Asphalt. A report of the findings of ICT-R27-189. Illinois Center for Transportation Series No. 21-023. Research Report No. FHWA-ICT-21-018. Illinois Center for Transportation, Rantoul, IL. https://doi.org/10.36501/0197-9191/21-022
Series/Report:FHWA-ICT-21-018
Genre:Other
Type:Text
Language:English
URI:http://hdl.handle.net/2142/110126
ISSN:0197-9191
DOI:https://doi.org/10.36501/0197-9191/21-023
Sponsor:IDOT-ICT-189
Rights Information:No restrictions. This document is available through the National Technical Information Service, Springfield, VA 22161.
Date Available in IDEALS:2021-07-09


This item appears in the following Collection(s)

Item Statistics