Browse Dept. of Industrial and Enterprise Systems Engineering by Contributor "Palekar, Udatta"

  • Stowers, Curtis Louis (1993)
    Lot-sizing problems focus on determining a minimal total production cost schedule. These production costs are generally composed of three components: a variable production cost, an inventory holding cost, and a setup cost. ...

    application/pdf

    application/pdfPDF (8MB)Restricted to U of Illinois