Files in this item

FilesDescriptionFormat

application/pdf

application/pdf3198982.pdf (12MB)Restricted to U of Illinois
(no description provided)PDF

Description

Title:Facility/infrastructure Resource Scheduling
Author(s):East, Edward William
Doctoral Committee Chair(s):Liu, Liang Y.
Department / Program:Civil Engineering
Discipline:Civil Engineering
Degree Granting Institution:University of Illinois at Urbana-Champaign
Degree:Ph.D.
Genre:Dissertation
Subject(s):Computer Science
Abstract:Once FIRS has been implemented, it may be included as one portion of a realtime Operations and Maintenance control system. Such a system, when combined with building information models and location-aware computing devices, would allow near-optimal, dynamic crew scheduling. In addition to construction scheduling, the FIRS approach can directly assist disaster recovery and reconstruction planners and those in other time-sensitive dispatching domains.
Issue Date:2005
Type:Text
Language:English
Description:291 p.
Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2005.
URI:http://hdl.handle.net/2142/83273
Other Identifier(s):(MiAaPQ)AAI3198982
Date Available in IDEALS:2015-09-25
Date Deposited:2005


This item appears in the following Collection(s)

Item Statistics