Natural language processing and learning-based methods for enhancing automation, alignment, and interpretability in model-driven planning, monitoring, and control of construction projects
Jung, Yoonhwa
This item's files can only be accessed by the System Administrators group.
Permalink
https://hdl.handle.net/2142/130149
Description
- Title
- Natural language processing and learning-based methods for enhancing automation, alignment, and interpretability in model-driven planning, monitoring, and control of construction projects
- Author(s)
- Jung, Yoonhwa
- Issue Date
- 2025-07-09
- Director of Research (if dissertation) or Advisor (if thesis)
- Golparvar-Fard, Mani
- Hockenmaier, Julia
- Doctoral Committee Chair(s)
- Golparvar-Fard, Mani
- Committee Member(s)
- El-Rayes, Khaled
- El-Gohary, Nora
- Department of Study
- Civil & Environmental Eng
- Discipline
- Civil Engineering
- Degree Granting Institution
- University of Illinois Urbana-Champaign
- Degree Name
- Ph.D.
- Degree Level
- Dissertation
- Keyword(s)
- Construction Planning
- Lean Construction
- Project Controls
- Natural Language Processing
- Language Modeling
- Machine Learning
- Building Information Modeling
- Abstract
- Today, model-driven planning and control continue to face several challenges that negatively impact its widespread adoption across various types of construction projects. A key barrier lies in the high level of manual effort required during the planning phase, particularly associated with mapping elements within a building information model (BIM). This complexity arises from the varying levels of maturity among BIM models and levels of details in activities across different levels of a schedule. Another challenge is coordinating and communicating schedule activities with the trades, so they know who does what work in which location, daily. This level of day-to-day coordination and communication require superintendents to create and use short-term look-ahead plans. However, disconnections between long-term master schedules and short-term look-ahead plans complicate project coordination, and in particular monthly progress updates, and payment application reviews. Third, synchronizing planned and actual progress during progress tracking is also challenging as granularity of daily construction reports submitted by the trades often do not match rules of credits used for tracking physical and non-physical progress. While reality capture has become a common practice for progress tracking, in the absence of computer vision progress tracking, interpreting the content of the collected visual data has remained a subjective and manual process. These challenges break the feedback loop needed to use data from the field to frequently and reliably update progress through project controls and communicate the updated schedule accordingly. To address these challenges, this PhD dissertation introduces multiple domain-specific language and learning-based methods to enhance automation, alignment, and interpretability across project planning and control workflows. First, UniformatBridge, a new transformer-based natural language processing model, automatically labels activities in a project schedule with ASTM Uniformat classification. In this model, construction sequencing tokens are presented that capture logistically-constrained predecessor and successor activities into the BERT architecture. This model unlocks automated creation of 4D BIMs and brings consistency from the semantic segmentation of reality capture data to schedule or payment application structures, with or without BIM. The experimental data is comprised of manually labeled master schedules from ten different commercial building projects, totaling 35,998 activity sequence tuples. To further synchronize short-term planning from long-term schedules, the dissertation presents a domain-specific language model, ExpertScheduler, that automatically generates a list of potential look-ahead planning tasks directly from the master schedule activities. ExpertScheduler consists of a Mixture-of-Experts (MoE) mechanism in a Transformer encoder-decoder architecture and is integrated with Curriculum Learning to mimic human learning. Evaluated on data from four real-world projects, ExpertScheduler outperforms retrieval-augmented generation (RAG) frameworks in large language models (LLMs), achieving state-of-the-art performance among both fine-tuned and RAG-enhanced LLMs. The model supports superintendents in generating look-ahead tasks that are consistent with master schedules, while enabling them to easily make adjustments as needed. In addition, VisualSiteDiary, a Vision Transformer-based image captioning model, creates human-readable captions directly from visual logs for automated daily reporting and improved image retrieval tasks. The model incorporates pseudo-region features and diverse captioning styles, validated on a dataset of 6,406 training images with 12,812 captions and 1,409 validation images with 2,818 captions. This dataset includes many realistic, yet challenging cases commonly observed in commercial building projects. Finally, the dissertation introduces a hybrid framework that integrates heuristics and machine learning for schedule quality assessment. To assist planners, this method formalizes and automates evaluation against principles such as those defined in the Defense Contract Management Agency (DCMA)’s 14 Point Schedule Quality Assessment. Beyond current quantitative evaluations, the framework suggests a schedule quality assessment from both qualitative and quantitative perspectives. Central to this approach is EdgeSimGNN, a graph neural network model that quantifies adherence to best practices through graph similarity metrics. Experimental validation across thirty-five real-world projects, including 16,653 sub-schedule graph pairs from seven commercial master schedules, demonstrates the framework’s effectiveness in highlighting deviations and guiding planners with actionable insights. This lays the groundwork for a fully automated, data-driven schedule quality assessment system. The findings from this end-to-end project management research unlock new capabilities for learning and modeling construction planning and control knowledge, directly from project data as opposed to experience-driven heuristics. By formalizing scheduling practices, interpreting multimodal project data, and enabling alignment between planning layers, the presented methods empower more proactive forecasting, delay mitigation, and risk management throughout the project lifecycle. These contributions mark a step forward in transforming construction planning from static, expert-driven processes into dynamic, data-informed systems that can adapt and evolve with the realities of the jobsite.
- Graduation Semester
- 2025-08
- Type of Resource
- Thesis
- Handle URL
- https://hdl.handle.net/2142/130149
- Copyright and License Information
- Copyright 2025 Yoonhwa Jung
Owning Collections
Graduate Dissertations and Theses at Illinois PRIMARY
Graduate Theses and Dissertations at IllinoisManage Files
Loading…
Edit Collection Membership
Loading…
Edit Metadata
Loading…
Edit Properties
Loading…
Embargoes
Loading…